Flamingo Marina Bulkheads Rehabilitation Project Environmental Assessment


The Flamingo Marina Bulkheads Rehabilitation Project Environmental Assessment (EA) evaluates a No Action alternative and two Action alternatives, describes the affected environment, and assesses the environmental consequences of implementing each alternative. Under the No Action alternative, only routine maintenance and emergency repairs would occur and the aging bulkheads, walkways, and amenities would continue to deteriorate and possibly fail. Alternative B would involve replacing the bulkheads using the "hydraulic impact hammer" method. Alternative C, the NPS preferred alternative, would be to replace the bulkheads using the "hard ground press-in method."

The EA, which has been prepared in accordance with National Environmental Policy Act (NEPA) regulations (40 CFR Part 1507), also describes and analyzes the adverse effects from the proposed undertaking to expand the width of the bulkhead concrete caps and demolish the Flamingo Maintenance Marina Bay boat shelter, a contributing resource to the Flamingo Mission 66 Developed Area Historic District. In accordance with National Historic Preservation Act Section 106 regulations (36 CFR 800.6(a)(4)), you are invited to express your views on resolving adverse effects of the undertaking.
 
Comment Period: Closed        May 10, 2024 - Jun 9, 2024
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.