PEPC and Parkplanning will be offline Monday, May 20th, from 8 PM to midnight MT, and Tuesday, May 21st, from 8 PM to midnight MT for network maintenance.
Comment period closes
May 26, 2024
 
at 11:59 PM Mountain Time in
Days, Hours, Min.

CUVA 224822 Draft Wetland/Floodplain Statement of Findings - Peninsula


The Wetlands Statement of Findings (SOF) analyzes the proposed action for bank stabilization at the Peninsula site along the Cuyahoga River to protect the Towpath Trail. The SOF includes the existing conditions of the site, the proposed work for stabilization, and wetland compensation.

The Floodplain SOF quantifies the flood hazards associated with riverbank stabilization at the Peninsula site. The Floodplain SOF presents the rationale for the development of the proposed project within the regulatory floodplain of the Cuyahoga River, documents the anticipated negative impacts of these improvements on human health/life, capital investment, and floodplain functions and values, and presents mitigations to these impacts.
 
Comment Period: Apr 26, 2024 - May 26, 2024
Comment period closes May 26, 2024 at 11:59 PM Mountain Time in:
Days, Hours, Min.
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.