CRLA SETP Implementation Strategy Table


This spreadsheet is the implementation strategy table that accompanies the Crater Lake National Park Draft Self-Evaluation and Transition Plan. The draft plan provides an overview of findings and recommended solutions in a brief narrative and bulleted list, along with corresponding site plans that illustrate existing conditions. The companion implementation strategy table provides details on each barrier, recommended solution, and target time frame.
 
Comment Period: Closed        May 8, 2024 - Jun 14, 2024
Document Content:
FINAL APRIL 2024 CRLA_SETP_IST.xlsx   (150.5 KB, .xlsx file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.