A comment period for this project closes May 26, 2024:
Days, Hours, Min.

CUVA 224822 Draft Wetlands Statement of Findings- Towpath Mudcatcher


This wetlands statement of findings (SOF) analyzes the proposed action for bank stabilization at Towpath Mudcatcher site along the Cuyahoga River to protect the Towpath Trail. The SOF includes the existing conditions of the site, the proposed work for stabilization, and wetland compensation.
 
Comment Period: Closed        Dec 1, 2023 - Dec 15, 2023
Document Content:
CUVA Mudcatcher WSOF 2023.12.11.pdf   (6.8 MB, PDF file)