Final EA for Belnap and Big Springs Pipeline Grazing Permit Renewal


This is the final version of the Environmental Assessment for the Belnap and Big Springs Pipeline Grazing Permit Renewal.
 
Document Content:
EA-Final-BelnapBigSpringGPR.pdf   (9.9 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.