MS TIG Draft Restoration Plan 4 and Environmental Assessment: Restoration of Wetlands, Coastal, and Nearshore Habitats; Nutrient Reduction (Nonpoint Source); and Provide and Enhance Recreational Opportunities


Consistent with the PDARP/PEIS, the Mississippi Trustee Implementation Group has completed the Draft Restoration Plan 4/Environmental Assessment. In the Draft Plan, the MS Trustee Implementation Group proposes projects to partially restore injuries to wetlands, coastal, and nearshore habitats; reduce nutrient pollution (nonpoint source); and provide and enhance recreational opportunities to compensate for lost recreational use in the Mississippi Restoration Area as a result of the Deepwater Horizon oil spill. A No Action alternative is also evaluated for each of the restoration types. The approximate cost to implement the the seven preferred alternatives is $26.4 million.

The trustees will post a pre-recorded webinar to present an overview of the draft restoration plan and the proposed preferred alternatives. It will be available at https://www.mdeq.ms.gov/restoration/ no later than September 15, 2023.
 
Comment Period: Closed        Aug 31, 2023 - Oct 13, 2023
Document Content:
RP4 508 08.08.2023 v2.pdf   (10.6 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.