Project Links
Glacier National Park » Swiftcurrent Area Water, Road, and Parking Improvements » Document List » Document Contents
Story Map for Civic Engagement
Glacier National Park is beginning civic engagement for a proposal to close the Swiftcurrent developed area to the public to facilitate proposed road and parking improvements and a water system replacement. The Swiftcurrent developed area would be closed during the construction period, from the fall of 2024 until spring of 2026.
Please follow the link below for a story map describing the proposal.
Comment Period:
Closed
Jun 30, 2023 - Jul 30, 2023
|
Document Content: |
Swiftcurrent_StoryMap_20230630.pdf
(7.0 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |