Belnap and Big Spring Pipeline Allotments Grazing Permit Renewal - DOI-BLM-AZ-A030-2023-0002-EA NPS PEPC 111150 508 compliant


This is the recent 508 compliant version of the BBSP GPR EA
 
Comment Period: Closed        Jul 3, 2023 - Jul 12, 2023
Document Content:
EA-BelnapBigSpringGPR-2023-05-22.pdf   (16.3 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.