Project Links
Grand Canyon-Parashant National Monument » Belnap and Big Spring Pipeline Allotment Grazing Permit Renewal » Document List » Document Contents
Belnap and Big Spring Pipeline Allotments Grazing Permit Renewal - DOI-BLM-AZ-A030-2023-0002-EA NPS PEPC 111150 508 compliant
This is the recent 508 compliant version of the BBSP GPR EA
Comment Period:
Closed
Jul 3, 2023 - Jul 12, 2023
|
Document Content: |
EA-BelnapBigSpringGPR-2023-05-22.pdf
(16.3 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |