Project Links
Hawai`i Volcanoes National Park » Hawai'i Volcanoes Air Tour Management Plan (ATMP) » Document List » Document Contents
Hawai'i Volcanoes Draft ATMP, EA and FAQs
Hawai'i Volcanoes Draft ATMP and EA
Comment Period:
Closed
May 16, 2023 - Jun 20, 2023
|
Document Content: |
Draft ATMP
(1.5 MB, PDF file)
ATMP Environmental Assessment
(7.4 MB, PDF file)
HAVO ATMP EA Appendices
(10.1 MB, PDF file)
Draft ATMP and EA FAQs
(202.2 KB, PDF file)
Draft ATMP and EA Presentation.pdf
(3.8 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |