Draft EIS Reconstruction of the Furnace Creek Water Collection System


The proposed project would rebuild the outdated water collection system in the Furnace Creek area to deliver a safe and reliable potable and nonpotable water supply to the park's main visitor use area.
 
Comment Period: Closed        Oct 14, 2005 - Dec 12, 2005
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.