Project Links
Death Valley National Park » Reconstruction of Furnace Creek Water Collection System » Document List » Document Contents
Draft EIS Reconstruction of the Furnace Creek Water Collection System
The proposed project would rebuild the outdated water collection system in the Furnace Creek area to deliver a safe and reliable potable and nonpotable water supply to the park's main visitor use area.
Comment Period:
Closed
Oct 14, 2005 - Dec 12, 2005
|
![]() |
Document Content: |
Reconstruction of the Furnace Creek Water Collection System Part 1
(4.6 MB, PDF file)
Reconstruction of the Furnace Creek Water Collection System Part 3
(4.5 MB, PDF file)
Reconstruction of the Furnace Creek Water Collection System Part 2
(3.1 MB, PDF file)
Reconstruction of the Furnace Creek Water Collection System Part 4
(900.5 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |