Project Links
Fredericksburg and Spotsylvania National Military Park » Proposed NPS Approval, Archeological Investigation, 2023, George Washington's Boyhood Home NHL » Document List » Document Contents
GWBH Scope of Work 2023
goals of and Research Design for proposed archeological investigation in 2023; site plan; site photos; location-map; map of Area of Potential Effect; proposed curation/cataloging, reporting, and protocols for avoiding burials and in the event of discovery of those or funerary objects
Comment Period:
Closed
Apr 7, 2023 - May 7, 2023
|
Document Content: |
GWBH Scope of Work 2023.pdf
(813.8 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |