Project Links
Grand Portage National Monument » CSAH17/Mile Creek Road Realignment and Bridge Construction » Document List » Document Contents
Wetland Statement of Findings - Mile Creek Road Realignment and Bridge Construction
Wetland Statement of Findings (WSOF) for the Mile Creek Road Realignment and Bridge Construction project at Grand Portage National Monument.
In compliance with NPS Procedural Manual #77-1: Wetland Protection, this document was available for public review for 30 days. The accompanying environmental assessment (EA) was open for public review concurrently with the WSOF.
A wetland delineation was completed in 2021, which identified 0.76 acres of Type 6 (riverine and palustrine scrub/shrub and forested) wetland in the vicinity of the project area. Wetlands that could be impacted by the proposed road realignment project (0.33 acres) are shown in Figure 6 of the WSOF. As compensation for these impacts, invasive species would be removed from 5.4 acres of wetlands in the park.
Comment Period:
Closed
Feb 2, 2023 - Mar 4, 2023
|
Document Content: |
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |