Project Links
Everglades National Park » Gulf Coast Site Plan and Maintenance Dredging » Document List » Document Contents
Gulf Coast Site Plan and Maintenance Dredging Environmental Assessment
Environmental Assessment evaluates the effects of providing a new visitor center, dredge the marina boat basin and boat channels and increase infrastructure resiliency on site as a result of Hurricane Irma (2017) and Hurricane Ian (2022) and as presented in the 2015 General Management Plan/East Everglades Wilderness Study.
Comment Period:
Closed
Jan 24, 2023 - Feb 26, 2023
|
Document Content: |
2023-01-24 NPS EVER Gulf Coast Site Plan_Final_EA_complete_508
(47.4 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |