Project Links
Yosemite National Park » Rehabilitate the El Portal Wastewater Treatment Plant » Document List » Document Contents
Draft Floodplain Statement of Findings for El Portal Wastewater Treatment Plant
Draft Floodplain Statement of Findings for El Portal Wastewater Treatment Plant. The WWTP was identified as being a Class II action within the 500-year floodplain (aka the 0.2% chance of annual flooding zone) in the Merced Wild and Scenic River Plan EIS ROD Floodplain Statement of Findings. The EIS found that "the presence of the facility is essential and prohibits alternative land uses at the same location" (MRP pg. 6-28). No alternative areas of sufficient size or location are available outside of the floodplain (MRP 7-19).
Comment Period:
Closed
Oct 4, 2022 - Nov 2, 2022
|
Document Content: |
2022_08_18_FSOF EP WWTP Rehab_FINAL_508.pdf
(2.2 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |