Project Links
Flagstaff Area National Monuments » Wupatki Backcountry Management Plan » Document List » Document Contents
Finding of No Significant Impact - Backcountry Management Plan/GMP Amendment/EA - April 2022
The National Park Service is pleased to announce the availability of the Finding of No Significant Impact (FONSI) for the Wupatki National Monument Backcountry Management Plan/Environmental Assessment (plan/EA). The FONSI summarizes the public comments received during the public review period that concluded January 30, 2022, responds to those comments, identifies changes to the text in the plan/EA as a result of the comments, and includes the non-impairment determination required by NPS policy. The National Park Service will continue to consult with the Arizona State Historic Preservation Office and associated tribes on a project-level basis throughout the implementation and lifespan of the plan/EA.
The FONSI, signed by the NPS regional director for Interior Regions 6, 7, and 8 on April 25, 2022, describes the selected action and explains why the plan will have no significant effects on the natural, cultural, or human environment. Therefore, an environmental impact statement will not be prepared.
Document Content: |
WUPA BMP FONSI_508_2022-0428.pdf
(702.0 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |