Project Links
Saint Croix National Scenic Riverway » Cable Connector Trail » Document List » Document Contents
Cable Connector Trail Bike Rule - Final Rule
The regulation that allows bicycles on the Cable Connector Trail. This rule was published in the federal register on February 17, 2022 and will be effective on March 21, 2022.
Document number: 2022-03394
Document Content: |
CableConnectorTrail_bikerule_2022-03394.pdf
(249.5 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |