Project Links
Great Basin National Park » Refurbish and Improve the Lower Lehman Campground » Document List » Document Contents
Lower Lehman Creek Campground Improvements Press Release for Public Scoping
This press release announces the 30-day public scoping period for proposed improvements to the Lower Lehman Creek Campground. Details can be found in the Public Scoping Letter as identified in the press release.
Comment Period:
Closed
Nov 2, 2021 - Dec 1, 2021
|
Document Content: |
508PublicScopingPressReleaseforLowerLehmanCampground-11_2_21.pdf
(174.3 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |