Draft Summary for Alternatives for Catoctin Mountain Park Alternative Workshop and Workshop Newsletter


The draft summary of the alternatives for review by the public prior to the Alternatives Workshop on April 20, 2005. Included is the Workshop Newsletter
 
Comment Period: Closed        Apr 13, 2005 - May 4, 2005
Document Content:
Workshop Newsletter   (397.2 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.