Preliminary Trails Management Plan


Preliminary desired conditions and trail management strategies for all units of the park. Prepared using previous public comment and input from professional trail designers. Includes maps of existing trail system in the park, proposed future trail alignments, and proposed actions needed to realize those alignments.

Please consider sharing your thoughts on this preliminary plan here, or visit the project storymap at https://arcg.is/1PKmna, where you can share map-based recommendations.
 
Comment Period: Closed        Mar 15, 2021 - Apr 15, 2021
Topic Questions:
1. Please share your feedback on the preliminary management strategies here. The planning team is particularly interested in feedback on the proposed strategies, their efficacy, other strategies that have not been proposed that may work well, and specific trail connections or infrastructure that is missing from the strategies, or that is potentially problematic or unsustainable.
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.