Project Links
Yosemite National Park » Mist Trail Visitor Safety Railing and Widening Improvements (2020) » Document List » Document Contents
Final CE Package- Mist Trail Railing and Widening Phase II
Final 508 compliant Categorical Exclusion Package for the Mist Trail Railing and Widening Project, Phase II.
Document Content: |
CE Package Mist Trail Railing and Widening Phase II- 508.pdf
(5.2 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |