Project Links
Buffalo National River » Repair and/or Replace Low Water Crossings and Approaches in Erbie Area » Document List » Document Contents
Erbie Road Improvements Environmental Assessment
The National Park Service (NPS), in cooperation with the Federal Highway Administration (FHWA), proposes to rehabilitate a 2.58-mile damaged section of Compton-Erbie Road (County Road 19) and to replace two low-water crossings in the Erbie area. All of the proposed work lies within the Buffalo National River (park), in Newton County, Arkansas. In May of 2015, a major storm event caused widespread damage in the park. Along with repair of the storm damage, improvements are necessary to reduce the likelihood of damage from future storm events. This Environmental Assessment (EA) examines two alternatives; the No Action Alternative and the Action Alternative.
Comment Period:
Closed
Apr 16, 2018 - May 15, 2018
|
Document Content: |
BUFF Erbie EA
(4.5 MB, PDF file)
BUFF Erbie EA Appendix B
(3.1 MB, PDF file)
BUFF Erbie EA Appendix C
(175.0 KB, PDF file)
BUFF Erbie EA Appendix A
(25.3 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |