Isa Lake Bridge Reconstruction EA

Yellowstone National Park » Isa Lake Bridge Reconstruction EA » Document List

You Are Now Leaving

parkplanning.nps.gov

National Park Service

Please note: The National Park Service does not control and cannot guarantee the relevance, timeliness or accuracy of the materials provided by other agencies or organizations, nor does the NPS endorse other agencies or organizations, thier views, products or services.

Isa Lake Bridge Reconstruction Project Approved

A plan to reconstruct Isa Lake Bridge located at Craig Pass on the Continental Divide has been approved.

Reconstruction of the bridge, which spans a section of the road connecting West Thumb and Old Faithful, is needed to bring the structure up to current design standards, improve safety, increase vehicle load capacity and preserve the historic integrity of the bridge. Improvements will also be made to adjacent parking and pullout areas to help maintain visitor access on this section of the Grand Loop Road into the future.

A Finding of No Significant Impact (FONSI) allowing the existing Isa Lake Bridge to be removed and a bridge of similar appearance on the existing alignment to be reconstructed was signed by the National Park Service Intermountain Regional Director, May 23, 2013. An Environmental Assessment (EA) that analyzed two alternatives was released for public review and comment March 14, 2013.

Among the highlights of the approved reconstruction plan:

• During bridge reconstruction, the road will remain open via a temporary bridge spanning Isa Lake to the north of the existing bridge.
• The existing parking area and pullouts will be repaired. One handicapped accessible parking space will be created.
• New curb logs will be installed.
• The existing kiosk structure will be rehabilitated.

The project will proceed when funding becomes available through the Federal Lands Highway Program and will take approximately two years to complete.

Copies of the EA and the FONSI are available on the National Park Service Planning, Environment and Public Comment (PEPC) Web site at http://parkplanning.nps.gov/Isa.