National Park Service
PEPC Planning, Environment & Public Comment
PEPC Home Documents by Park Policy/Links Park Planning Search Documents
  • (non-NPS links)

Overmountain Victory NHT Headquarters/Visitor Center Feasibility Study and Environmental Assessment Public Scoping Notice

The National Park Service (NPS) proposes to establish a new Headquarters and Visitor's Center (HQ/VC) for the Overmountain Victory National Historic Trail, a 330-mile long non-motorized route for public use that traverses portions of Virginia, Tennessee, North Carolina, and South Carolina.

This Feasibility Study and Environmental Assessment (EA) will analyze four different sites and assesses the impacts that could result from the operation of a new facility at each location. The EA also analyzes the no action alternative, which is the continued use and operation of the current headquarters at King's Mountain National Park, located in Blacksburg, SC.

Public meetings are now being held between 5:00pm and 8:00pm in four different locations to solicit input on the potential sites for the HQ/VC:
Comment Period: 10/29/2009 - 12/18/2009
Document Content:
OVVI HQ/VC Public Scoping NewsletterOVVI HQ/VC Public Scoping Newsletter   (1.1 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software.
You may download a free copy of Acrobat Reader from Adobe Systems.