National Park Service - Planning Environment and Public Comment (PEPC)

Project Links

GRANTING OF ACCESS BY NPS TO ANNE ARUNDEL COUNTY, MD FOR THE INSTALLATION OF UTILITIES BENEATH THE B-W PARKWAY AT RT 198 AND FOR THE ACQUISITION OF ADDITIONAL PROTECTIONS FOR THE PARKWAY AND PATUXENT RESEARCH REFUGE

Baltimore-Washington Parkway » Utility Crossing of B-W Parkway at MD Route 198 » Document List » Document Contents

Description: GRANTING OF RIGHT OF WAY ACCESS BY NATIONAL PARK SERVICE TO
ANNE ARUNDEL COUNTY, MARYLAND FOR THE INSTALLATION OF UTILITIES
BENEATH THE BALTIMORE-WASHINGTON PARKWAY AT THE MARYLAND
ROUTE 198 INTERCHANGE AND FOR THE ACQUISITION OF ADDITIONAL
PROTECTIONS FOR THE PARKWAY AND PATUXENT RESEARCH REFUGE

Comment Period: 10/09/2009 - 11/13/2009
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software.
You may download a free copy of Acrobat Reader from Adobe Systems.