National Park Service - Planning Environment and Public Comment (PEPC)

Project Links

Description: The environmental assessment (EA) describes and analyzes alternative locations for a visitor contact station and employee housing, and alternative means of improving visitor access, and interpretation of Port Oneida resources. In all alternatives rehabilitation and stabilization of historic structures, and stabilization of cultural landscapes occur at Port Oneida.
Comment Period: 09/17/2007 - 10/19/2007
Document Content:
Port Oneida EA (Part 1)Port Oneida EA (Part 1)   (1.6 MB, PDF file)
Port Oneida EA (Part 2)Port Oneida EA (Part 2)   (2.3 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software.
You may download a free copy of Acrobat Reader from Adobe Systems.