National Park Service
PEPC Planning, Environment & Public Comment
PEPC Home Documents by Park Policy/Links Park Planning Search Documents
  • (non-NPS links)

COMMENT PERIOD EXTENDED FOR 30 DAYS - DEIS Avalanche Hazard Reduction by Burlington Northern Santa Fe Railway in Glacier National Park and Flathead National Forest, Montana

Draft EIS
 
Comment Period: Closed        10/23/2006 - 01/29/2007
Document Content:
Dear Friends LetterDear Friends Letter   (29.0 KB, .doc file)
Title Page and Executive SummaryTitle Page and Executive Summary   (420.4 KB, PDF file)
Chapter 1Chapter 1   (942.5 KB, PDF file)
Chapter 2, Part A (Alternatives)Chapter 2, Part A (Alternatives)   (2.9 MB, PDF file)
Chapter 2, Part B (Alternatives)Chapter 2, Part B (Alternatives)   (3.4 MB, PDF file)
Chapter 3Chapter 3   (3.3 MB, PDF file)
Chapter 4Chapter 4   (814.1 KB, PDF file)
Chapter 5Chapter 5   (135.0 KB, PDF file)
Chapter 6Chapter 6   (105.8 KB, PDF file)
Appendix A Part 1Appendix A Part 1   (3.8 MB, PDF file)
Appendix A Part 2Appendix A Part 2   (3.5 MB, PDF file)
Appendix BAppendix B   (114.3 KB, PDF file)
Appendix C Part 1Appendix C Part 1   (4.2 MB, PDF file)
Appendix C Part 2Appendix C Part 2   (1.2 MB, PDF file)
GlossaryGlossary   (45.5 KB, PDF file)
IndexIndex   (53.8 KB, PDF file)
Back Inside CoverBack Inside Cover   (35.4 KB, PDF file)
SpineSpine   (18.5 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software.
You may download a free copy of Acrobat Reader from Adobe Systems.