National Park Service
PEPC Planning, Environment & Public Comment
PEPC Home Documents by Park Policy/Links Park Planning Search Documents
  • (non-NPS links)

Newsletter #1 - Feasibility Study for non-motorized boathouse zone

This newsletter announces the upcoming public meeting for the Feasibility Study for the non-motorized boathouse zone. It also specifics the schedule for the project and provides an overview of the history of the non-motorized boathouse zone.

The purpose of this study is to identify specific ways the NPS can enhance access to the river for user groups. As part of the process for this study, the NPS will be conducting a series of interviews and stakeholder workshops. The NPS welcomes comments and looks forward to getting your input.
 
Comment Period: Closed        12/13/2011 - 03/30/2012
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software.
You may download a free copy of Acrobat Reader from Adobe Systems.